131 687 Service-Hotline Free phone number
Contact form
GYERMELYI Stage
TOP PRODUCER NOW ON TOP OF AUTOMATED LOGISTICS.

Gyermelyi's new warehouse system surpasses expectations.

Gyermelyi AG needed a new warehouse that would keep up with expanded production and also fit into existing systems. Jungheinrich’s Cantilever racking combined with AGV ERC stackers and tailor-made systems ensure seamless integration into Gyermelyi's existing fully-automated logistics.

Challenges

  • Better storage systems needed due to production outstripping current storage capacity.
  • Smooth integration into existing transport systems was required.
  • Suitable fully-automated stackers were needed.
  • New systems had to be compatible with WMS.
  • A reliable automated connection between all three warehouses needed to be established.

Solutions

  • Cantilever high-rack storage system installed.
  • Connection created between new warehouse and existing transport.
  • 8 Automated Guided ERC Stackers delivered with lithium-ion battery technology.
  • AGVs linked to existing ERP system via the Jungheinrich Logistics Interface.
  • New Logistics Interface integrated, allowing automated processes throughout.

Benefits

  • Maximum storage capacity levels achieved.
  • Uninterrupted delivery and removal of goods.
  • Continuous automated warehouse stacking.
  • Unified Warehouse Management System.
  • All operations automated and continuous.


GYERMELYI AG auf einen Blick:

Do you want to improve your automation?

Contact us to make an appointment for a consultation.

Stage Dividende

Your contact

Service

Phone

131 687

Get in touch


Further references:

Need help?